Before: Failing main beam with original plan for sistering that wouldn’t fully address the issue long-term.
After: Upgraded to a SmartJack® system with a supplemental beam for proper stabilization—achieving strong support and even minor lift in parts of the home. Additional joist repairs and full LumberKote protection completed.
A great example of adjusting the plan to deliver the right solution and long-term results.